Multi-view Monitoring Equipment for Transmission Lines Ensures Stable Operation of Power Grids
Contact Info
- Building C-9, Floor C, Precision达 Industrial Park, No.39 Qingfeng Avenue, Longgang Sub-district, Longgang District, Shenzhen City, 518116
- 李女士
- 13682351635
- 1920671927@qq.com
Product Aliases: Multi-view Monitoring Equipment for Transmission Lines, Grid Multi-view Intelligent Monitoring System, Panoramic Multi-view Camera for Transmission Lines, Multi-view AI Monitoring Device for Transmission Lines
Product Model: TLKS-PMG-100BM

I. Product Overview
In the field of power inspection, the traditional manual inspection method is not only inefficient, but also difficult to cope with the complex and changeable power grid environment. To solve this problem, Shenzhen Telcom Technology Co., Ltd. has launched the Multi-view Monitoring Equipment for Transmission Lines. With its efficient and intelligent features, this device has brought a revolutionary change to power inspection.

II. Operation Mechanism
The Multi-view Monitoring Equipment for Transmission Lines is an integrated system, whose core components include high-definition cameras, pan-tilt and data transmission modules, forming a multi-view monitoring capability. The omnidirectional pan-tilt camera can rotate 360° horizontally and +90° vertically, realizing panoramic dead-angle-free monitoring and breaking through the limitations of traditional methods. Multiple cameras work together to provide rich views and comprehensive information, supporting real-time video browsing. It integrates lightweight AI algorithms, enabling front-end intelligent identification of risks and defects, improving monitoring efficiency and accuracy.

III. Product Features
1. Adopts an industrial-grade high-definition dual-side dual-view camera and pan-tilt integrated design;
2. Equipped with lenses for monitoring the channels of large and small dual-side lines respectively, and an optical zoom pan-tilt camera;
3. Both dual-side line channels are equipped with day and night lenses, realizing 24-hour high-definition full-color image acquisition;
4. The angles of the dual-side cameras can be manually adjusted, supporting vertical adjustment to adapt to different installation environments.

IV. Technical Parameter Overview
1. The pixel of the day-time line channel camera is not less than 16 million, and the image resolution reaches 4608×3456;
2. The night-time line channel camera adopts a 1/1.8 starlight-level camera, with a pixel of not less than 2 million, and the image resolution is 1920×1080;
3. The pixel of the pan-tilt camera and optical zoom camera is not less than 2 million, the image resolution is 1920*1080, and the optical zoom multiple is greater than or equal to 20 times;
4. Has strong anti-electromagnetic interference capability, suitable for complex environments such as the power industry;
5. Low-power design, supports wide-voltage input, suitable for solar power supply;
6. Operating temperature range: high temperature 70℃, low temperature -40℃; protection level reaches IP66;
7. Built-in 4G full Netcom module;
8. Supports transmission protocols of the State Grid and China Southern Power Grid, and has a built-in security encryption chip to ensure secure data transmission.

V. Product Summary
In the field of power inspection, the Multi-view Monitoring Equipment for Transmission Lines has become a powerful assistant for operation and maintenance personnel with its efficient and intelligent features. In the future, we will continue to be committed to technological innovation and product optimization, providing users with more intelligent and efficient power inspection solutions, and jointly promoting the safe and intelligent development of the power industry. For equipment details, please consult Ms. Li from Telcom: 13682351635 (WeChat is synchronized). The customized product quotation is a market reference price, and the actual price is subject to negotiation.

VI. Usage Notes
① During the customization process, both parties shall protect intellectual property rights and avoid infringement risks.
② Conduct technical evaluation on the user's customized requirements to ensure that they can be realized and meet the requirements.
③ Regularly carry out appearance inspection, performance testing and cleaning and maintenance of the equipment, and find and solve problems in a timely manner.
4. Before installation, please carefully read the product installation manual to understand the installation steps, required tools and safety requirements.
| Instruments & Meters/Measurement Standards/Electromagnetic Metrology Standards | |